Terzo valico: differenze tra le versioni

Da Wikipedia, l'enciclopedia libera.
Vai alla navigazione Vai alla ricerca
Contenuto cancellato Contenuto aggiunto
Rail-E.464 (discussione | contributi)
Fix infobox.
Rail-E.464 (discussione | contributi)
→‎Percorso: Aggiunto portale galleria Interconnessione di Novi.
Riga 74: Riga 74:
{{Percorso_fer1|extSTRe|40+794}}
{{Percorso_fer1|extSTRe|40+794}}
{{Percorso_fer1|extSTRa|36+585||galleria Serravalle|(7.094 m)}}
{{Percorso_fer1|extSTRa|36+585||galleria Serravalle|(7.094 m)}}
{{Percorso_fer5|dCONTgq|ekABZq2|O3=extkSTRc3|xtKRZ|dCONTfq||||[[ferrovia Torino-Genova]]}}
{{Percorso_fer5|dCONTgq|eABZq2|O2=exÜWu2|xtKRZ|O3=extSTRc3|dCONTfq||||[[ferrovia Torino-Genova]]}}
{{Percorso_fer1|extkABZg+4|33+705||interconnessione di Novi}}
{{Percorso_fer3|extSTRc1|extABZg+4||33+705||interconnessione di Novi}}
{{Percorso_fer1|extSTRe|29+491}}
{{Percorso_fer1|extSTRe|29+491}}
{{Percorso_fer1|exDST|28+735|PM Libarna}}
{{Percorso_fer1|exDST|28+735|PM Libarna}}

Versione delle 18:36, 10 ott 2021

Tortona/Novi Ligure-Genova
Terzo valico dei Giovi
Alta Velocità - Alta Capacità
Stati attraversatiBandiera dell'Italia Italia
InizioTortona/Novi Ligure
FineGenova
Attivazione2024 (prevista)
GestoreRFI
Lunghezza53 km
Scartamento1435 mm
ElettrificazionekV CC (predisp. per 25 kV CA)[1]
NoteSito web del progetto: terzovalico.it
Sito web commissario: terzovalico.mit.gov.it
Ferrovie

La ferrovia Tortona/Novi Ligure-Genova, conosciuta anche come Terzo valico dei Giovi, o più semplicemente come Terzo valico, è una linea ferroviaria in costruzione finalizzata a creare un collegamento veloce fra Genova e Tortona; i lavori sono iniziati nell'autunno 2013 e la linea sarà completata nel 2024.[2]

La linea è ritenuta una priorità nell'ambito del collegamento con l'Europa centrale per il trasporto delle merci che transitano giornalmente dal porto ligure. In particolare, l'opera si inserisce nel Corridoio Reno - Alpi[3], che è uno dei corridoi della rete strategica transeuropea di trasporto che collega le regioni europee più densamente popolate tra il porto di Rotterdam (sul Mare del Nord) e il Nord Italia.[4]

Storia

La costruzione della linea venne inizialmente affidata al Consorzio Collegamenti Integrati Veloci, quale contraente generale, costituito nel 1991 dalle imprese Grassetto Lavori (di Salvatore Ligresti) con il 25%, Del Prato con il 25%, Itinera (che faceva capo a Marcellino Gavio) con il 20%, Gambogi con il 20%, Tecnimont SpA con il 5%, CER fra le cooperative di Produzione e Lavoro con il 3% e Collegamenti Integrati Veloci SpA (gruppo bancario) con il 2%. Le stesse furono presto coinvolte in un un'inchiesta per tangenti: alcune di esse fallirono, altre vennero rilevate dalla Itinera, le restanti si ritirarono dal consorzio.

Nel 1996 si cominciò a scavare tre fori pilota. Una nuova procedura di Valutazione di Impatto Ambientale si concluse negativamente, e il 24 febbraio 1998 i cantieri del consorzio furono chiusi dal Nucleo Operativo Ecologico dei Carabinieri in seguito ad un'inchiesta promossa dalla Procura di Milano che sfociò nell'assoluzione degli imputati per la intervenuta prescrizione del reato.

Nel 1999 la IX Commissione Trasporti della Camera dei deputati impegnò il Governo a promuovere nuovamente il progetto terzo valico quale parte prioritaria della prevista tratta Milano-Genova. Il 21 dicembre 2001 il Comitato Interministeriale per la Programmazione Economica (CIPE) approvò il primo programma delle opere strategiche ex Legge n. 443 del 21 dicembre 2001 ("Legge Obiettivo") inserendo il progetto del Terzo Valico ferroviario nell'elenco delle infrastrutture strategiche e delle opere di preminente interesse nazionale. Nel 2002 il Ministero delle infrastrutture e dei trasporti approvò il tracciato che l'anno seguente ottenne il via libera definitivo.[5]

Il 29 settembre 2003 il CIPE approvò il progetto preliminare e lo studio di impatto ambientale del "Terzo valico dei Giovi". Il costo complessivo delle opere venne stabilito in 5 miliardi di euro che, per le opere di maggiore priorità, sarebbero stati anticipati da Rete Ferroviaria Italiana (RFI). Il 26 ottobre 2004 un decreto interministeriale consentì alla società Infrastrutture SpA un indebitamento di 35 miliardi di euro contro i 25 fissati dal decreto di fine 2003. Per far fronte a ciò, il Governo autorizzò quindi la società a emettere bond pluriennali per complessivi 4,7 miliardi di euro.

Nel frattempo il Consorzio era così diventato:

Nel marzo 2006 il CIPE approvò il progetto definitivo sbloccando il 18 dicembre 2008 una quota pari a 7.356 milioni di euro, mille circa dei quali destinati all'inizio dei lavori per la realizzazione dell'opera. Il restante ammontare dell'investimento sarà coperto tramite l'emissione di obbligazioni dalla Cassa depositi e prestiti.

Il 28 luglio 2011 Rete Ferroviaria Italiana ha sottoscritto il verbale di accordo con il Consorzio per dare avvio ai lavori di costruzione. Il CIPE ha successivamente deliberato lo stanziamento di 500 milioni di euro per la viabilità e la riapertura dei cantieri[6] e di 1.100 milioni di euro per finanziare il secondo lotto, che include lo scavo della galleria di valico.

I cantieri sono stati aperti nel corso del 2013.

Nel 2014 il consorzio ha visto l'uscita della Tecnimont Spa e di conseguenza le restanti società si sono suddivise in questo modo:

Il 27 luglio 2015 è stato abbattuto l'ultimo diaframma della galleria Campasso, che permetterà di collegare la galleria di valico all'intersezione con la linea ferroviaria esistente.[7]

La galleria Polcevera, una delle 4 gallerie di servizio, è stata completata il 29 ottobre 2015; lo scavo dei 1958 metri di questa galleria è avvenuto grazie all'uso di una TBM S-914.[8]

A seguito di alcune inchieste per corruzione, sono state invalidate nel 2017 13 gare d'appalto ed il Governo ha nominato l'ing. Marco Rettighieri amministratore straordinario del Cociv, il consorzio di imprese titolare della realizzazione dell’opera per conto di Rete Ferroviaria Italiana, e composto da Salini-Impregilo con il 64%, Società Italiana Condotte d’Acqua S.p.A. 31% e Civ 5%[9]. Il 24 novembre 2018, l'ANAC e il Prefetto di Roma hanno firmato il provvedimento di cessazione anticipata dall'incarico di amministratore straordinario, riportando ai soci del Consorzio la gestione operativa dell'opera[10].
Fra la fine del 2018 ed il 2019, è prevista l'apertura dei cantieri per interventi infrastrutturali e tecnologici relativi al quadruplicamento della linea Pavia-Milano Rogoredo e alla riduzione dei tempi di percorrenza fra Rogoredo e Tortona[11].

Nel corso del 2018 la prosecuzione dell'opera è stata condizionata all'esito di uno studio di analisi costi benefici: da tale analisi è risultato che i costi sono superiori ai benefici. Tuttavia, in considerazione dello stato di avanzamento dei lavori e del fatto che gli appalti fossero già in corso, abbandonare l'opera avrebbe avuto dei costi contrattuali notevoli; pertanto il 13 dicembre 2018 il Ministro Danilo Toninelli ha presentato il rapporto di valutazione ed espresso un parere favorevole alla prosecuzione dell'opera con opportune modifiche.[12][13] Il 5 giugno 2019 l'opera è stata accorpata con il passante ferroviario di Genova.[14]

Caratteristiche

Percorso

[A 1] Stazioni e fermate 
Continuation backward
per Milano e per Piacenza
Non-passenger station/depot on track
52+779 Bivio/PC Tortona
Unknown route-map component "CONTgq" Unknown route-map component "ABZgr"
per Alessandria
Non-passenger station/depot on track
47+550 Rivalta Scrivia
Unknown route-map component "CONTgq" Unknown route-map component "xABZgr"
45+215 bivio raccordo Pozzolo, per Novi Ligure
Unknown route-map component "exSKRZ-Au"
raccordo Autostradale A26/A7
Unknown route-map component "extSTRa"
42+778 galleria Pozzolo (1.984 m)
Unknown route-map component "extSTRe"
40+794
Unknown route-map component "extSTRa"
36+585 galleria Serravalle (7.094 m)
Unknown route-map component "dCONTgq"
Unknown route-map component "eABZq2" + Unknown route-map component "exÜWu2"
Unknown route-map component "xtKRZ" + Unknown route-map component "extSTRc3"
Unknown route-map component "dCONTfq"
ferrovia Torino-Genova
Unknown route-map component "extSTRc1" Unknown route-map component "extABZg+4"
33+705 interconnessione di Novi
Unknown route-map component "extSTRe"
29+491
Unknown route-map component "exDST"
28+735 PM Libarna
Unknown route-map component "extSTRa"
28+464 galleria di Valico (27.342 m)
Unknown route-map component "extSTR+GRZq"
confine Piemonte-Liguria
Unknown route-map component "extCONTgq" Unknown route-map component "extABZgr"
2+501 interconnessione di Voltri, per Ventimiglia
Unknown route-map component "extSTRe"
1+222
Unknown route-map component "extSTRa"
1+178 galleria Campasso (741 m)
Unknown route-map component "extSTRe"
0+437
Unknown route-map component "xABZg+l" Unknown route-map component "CONTfq"
per Tortona
Non-passenger station/depot on track
0+000 Bivio/PC Fegino
Unknown route-map component "CONTgq" Unknown route-map component "ABZgr"
per Genova Piazza Principe (via Sampierdarena), per Genova Campasso / porto di Genova
Continuation forward
per Genova Piazza Principe (via Granarolo)
Manuale · Legenda · Convenzioni di stile

Il tracciato si svilupperà per 53 chilometri, 37 dei quali in galleria; è inoltre prevista la realizzazione di interconnessioni per complessivi 13 km. La tratta sarà integrata con la rete ferroviaria già esistente, assicurando a sud il collegamento diretto con i bacini portuali e con le linee Genova-Ventimiglia e Genova-Pisa; a nord sarà collegata alla linea per Torino in prossimità di Novi Ligure e, in direzione di Milano, alla linea Alessandria-Piacenza, in prossimità di Tortona.[15]

La linea da Genova a Novi Ligure, indipendente rispetto alle linee esistenti, utilizzerebbe gallerie naturali, tranne un breve tratto all'aperto in corrispondenza di Libarna, dove è prevista la costruzione di un posto di movimento per le manovre di soccorso, sosta e manutenzione. Da Novi Ligure a Tortona dovrebbero essere realizzate due gallerie artificiali. Le gallerie naturali utilizzate sarebbero nove, mentre quelle artificiali progettate sono cinque.[16]

Tra le principali opere previste dal progetto, le più impegnative sono:

  • la galleria di Valico che, con 27 km, è la più lunga della linea (e d'Italia);
  • la galleria naturale Serravalle di circa 7 km;
  • la galleria artificiale Pozzolo di circa 2 km.

La prima fase della realizzazione prevede la costruzione, da Genova ad Arquata Scrivia, dei 27 km del tunnel di valico costituito da due gallerie affiancate e di 5,9 km di gallerie a binario semplice per le interconnessioni sul territorio di Genova, verso Voltri.[17]

La seconda fase prevede altri 14 km di doppie gallerie sotterranee da Arquata Scrivia a Novi Ligure, 3 km di gallerie per la connessione con Novi Ligure e 5 km di binario doppio allo scoperto.

Successivamente, per circa 16 km, il tracciato si estende oltre Novi Ligure, fino alla periferia di Tortona, collegandosi presso Pozzolo Formigaro con la linea preesistente e raddoppiandone il binario.[16]

Contando tutte le gallerie (sia quelle singole che quelle doppie), la totale lunghezza dei tunnel del Terzo Valico è di circa 87 km.[18]

Opere accessorie

La costruzione del terzo valico ha anche portato la creazione di molte opere accessorie in Liguria e Piemonte, tra cui le gallerie Borzoli-Erzelli a Genova che collegano il quartiere di Genova Borzoli con il casello autostradale "Genova Aeroporto" dell'autostrada A10 Genova-Savona accanto al parco scientifico tecnologico Great Campus degli Erzelli.[19] Le gallerie sono state inaugurate e aperte alla circolazione nel febbraio 2017.[20]


Costi e tempi

Secondo quanto riportato nel sito ufficiale dell'opera, la spesa complessiva è pari a 6,853 miliardi di euro divisi in 6 lotti costruttivi e 2 opere complementari nel Nodo di Genova (passante ferroviario di Genova e potenziamento dello scalo Genova-Campasso).[21] L'attivazione della linea è prevista entro il 2024.[22]

Critiche al progetto

Il terzo valico ha ricevuto diverse critiche in merito all'utilità e al costo.[23][24]

Note

  1. ^ Terzo valico - Progetto - Numeri, in terzovalico.it. URL consultato il 16 ottobre 2015 (archiviato dall'url originale il 26 ottobre 2015).
  2. ^ Comunicato stampa del 16/04/2021 | MIT, su www.mit.gov.it. URL consultato il 1º ottobre 2021.
  3. ^ San Gottardo, gli svizzeri ci hanno dato l'ennesima lezione, su Il Fatto Quotidiano, 1º giugno 2016. URL consultato il 1º giugno 2016.
  4. ^ Terzo valico - Progetto - Focus on, in terzovalico.it. URL consultato il 16 ottobre 2015.
  5. ^ Terzo valico - Progetto - Tappe del progetto, in terzovalico.it. URL consultato il 16 ottobre 2015 (archiviato dall'url originale il 26 settembre 2015).
  6. ^ Ministero delle infrastrutture e dei trasporti, su mit.gov.it.
  7. ^ ABBATTUTO L’ULTIMO DIAFRAMMA DELLA GALLERIA NATURALE CAMPASSO, PRIMO TUNNEL DI LINEA DEL TERZO VALICO - Cociv, su www.terzovalico.it. URL consultato il 25 novembre 2015.
  8. ^ LA TBM GIULIA TERMINA LO SCAVO DELLA FINESTRA POLCEVERA: AL VIA GLI SCAVI DELLA GALLERIA DI LINEA PIÙ LUNGA DEL TERZO VALICO - Cociv, su www.terzovalico.it. URL consultato il 25 novembre 2015.
  9. ^ Terzo valico, dopo le inchieste il commissario: 13 maxi-gare da rifare, su assoutenti.liguria.it, 4 aprile 2017 (archiviato il 25 settembre 2017).
    «Fra le misure attuate sul fronte della comunicazione, sono stati installati 17 monitor elettronici in undici comuni lungo il tracciato della nuova linea, che hanno la funzione di riportare informazioni relative al trattamento dell’amianto e ai controlli sulla qualità dell’aria effettuati in cantiere dal Cociv e caricati dall’Arpa»
  10. ^ Salini Impregilo al vertice del Terzo Valico, su trasportoeuropa.it.cloud.seeweb.it, 21 novembre 2018. URL consultato il 24 novembre 2018 (archiviato dall'url originale il 24 novembre 2018).
  11. ^ M. Morino, Terzo valico, Genova aggancia l’Europa, su ilsole24ore.com, 10 agosto 2017 (archiviato il 26 settembre 2017).
  12. ^ MIT - Analisi costi-benefici 2018
  13. ^ TERZO VALICO: ecco l'esito del Rapporto del MIT e le decisioni del Ministro TONINELLI, su www.ingenio-web.it. URL consultato il 13 dicembre 2018.
  14. ^ TELENORD, Sblocca cantieri, ok al Senato: il nodo ferroviario avrà un commissario, su telenord.it. URL consultato il 29 giugno 2020.
  15. ^ Terzo valico - Progetto - Il tracciato, in terzovalico.it. URL consultato il 16 ottobre 2015.
  16. ^ a b Ibidem
  17. ^ Terzo valico - Progetto - Opere principali, in terzovalico.it. URL consultato il 16 ottobre 2015.
  18. ^ Mit.Gov.it - Linea del Terzo Valico
  19. ^ TerzoValico.it Viabilità Borzoli-Erzelli
  20. ^ Comune.Genova.it - Nuova viabilità Chiaravagna Borzoli Erzelli: più sicurezza sulle strade del Ponente
  21. ^ Nodo di Genova | Commissario Terzo Valico, su terzovalico.mit.gov.it. URL consultato il 15 luglio 2021.
  22. ^ Focus on - Cociv, su www.terzovalico.it. URL consultato il 3 maggio 2021.
  23. ^ L’assurdità del Tav – Terzo Valico Archiviato il 25 maggio 2019 in Internet Archive. 7 marzo 2012
  24. ^ fivedabliu - Le ragioni tecniche del no al Terzo Valico 1 giugno 2018

Annotazioni

  1. ^ Le progressive chilometriche sono riferite al binario pari.

Bibliografia

  • Sergio Pedemonte, Per una storia del Terzo Valico, Ivlia Dertona, 2001, XLIX, 84.
  • Franco Manzitti, Bucare il futuro, De Ferrari editore, 2010.

Voci correlate

Altri progetti

Collegamenti esterni

Siti web ufficiali

Altri siti web